[1]
Al Sadi , H. and Dawood, M. 2021. Oil and Gas Projects in Sultanate of Oman: Construction Schedule and Cost Overrun . Journal of Student Research. 10, 3 (Aug. 2021). DOI:https://doi.org/10.47611/jsr.v10i3.1286.