Oil and Gas Projects in Sultanate of Oman: Construction Schedule and Cost Overrun

Authors

  • Hani Al Sadi Middle East College
  • Mahmoud Dawood Mentor, Middle East College

DOI:

https://doi.org/10.47611/jsr.v10i3.1286

Keywords:

Oil and Gas, Construction Industry, Cost overrun, Project Schedule

Abstract

Oil and Gas (O&G) industry is the primary source of the gross national income in gulf area. This industry is facing construction related issues that lead to cost overrun and delay in construction schedule of the construction related tasks. During COVID 19 pandemic, Sultanate of Oman O&G construction projects are facing many problems due to many factors. As a result and use these factors, about 70% of the major projects suffer from schedule slip and increasing costs. This has direct impact on the government budget with about 15% of GDP.  This research is discussing the main factors and its root causes that have direct impact on construction cost and schedule for O&G projects. This is has been done based on the literature and the conducted survey.

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

References or Bibliography

Adam, A., Josephson, P.-E. B., & Lindahl, G. (2017). Aggregation of factors causing cost overruns and time delays in large public construction projects. Engineering, Construction and Architectural Management.

Alsuliman, J. A. (2019). Causes of delay in Saudi public construction projects. Alexandria Engineering Journal, 58(2), 801–808.

Amri, T., & Marey-Pérez, M. (2020). Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman. Journal of Project Management, 5(2), 87–102.

Annamalaisami, C. D., & Kuppuswamy, A. (2019). Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 1–11.

Bin Seddeeq, A., Assaf, S., Abdallah, A., & Hassanain, M. A. (2019). Time and cost overrun in the Saudi Arabian oil and gas construction industry. Buildings, 9(2), 41.

Durdyev, S. (2020). Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management.

Kazemi, A., Katebi, A., & Kazemi, M.-H. (2018). Causes of delay in construction projects: the case of oil and gas projects. IJARE, 4, 1.

Riazi, S. R. M., & Nawi, M. N. M. (2018). Project delays in the Malaysian public sector: causes, pathogens and the supply chain management approach. Industrial Engineering, 9(8).

Ruqaishi, M., & Bashir, H. A. (2015). Causes of delay in construction projects in the oil and gas industry in the gulf cooperation council countries: a case study. Journal of Management in Engineering, 31(3), 5014017.

Shibnai Abdussalam and Salah Karim. (2016). Time and Cost Overrun in Construction Projects in Egypt Time and Cost Overrun in Construction Projects in Egypt Dr Abdussalam Shibnai Lecturer Coventry university , UK. SEPTEMBER 2015.

Umar, T. (2018). Causes of delay in construction projects in Oman. Middle East Journal of Management, 5(2), 121–136.

Published

08-30-2021

How to Cite

Al Sadi , H., & Dawood, M. (2021). Oil and Gas Projects in Sultanate of Oman: Construction Schedule and Cost Overrun . Journal of Student Research, 10(3). https://doi.org/10.47611/jsr.v10i3.1286

Issue

Section

Research Articles